Troubleshooting In An Antique Building

In this episode, Dan Holohan walks us through a troubleshooting job at Fraunces Tavern, which was built in 1719 and is the oldest structure in NYC.

 

Episode Transcript

It was like working with George Washington's axe. It’s an old joke. I show you a beat-up old axe and tell you that this is American history. It’s the very axe that George Washington used to chop down that cherry tree. Only thing is, the handle’s been replaced six times and the head four times. But it’s the very same axe!

Which brings me to Fraunces Tavern, which is down near the bottom of Manhattan Island. Built in 1719, it is the oldest structure in New York City. That was enough to get my attention, and when the heating contractor asked me to take a look at the heating system, which many hands have touched, I smiled and got on the Long Island Railroad.

It was here that George Washington bid farewell to members of the Continental Army at the conclusion of our American Revolution. And before the revolution, it was one of the meeting places of the Sons of Liberty. Throw a stick anywhere inside this building and you’ll hit significant American history, or a chicken pot pie. It’s a wonderful place and, as a native New Yorker, I was seeing it for the first time, which was a bit embarrassing. I really should have visited there sooner, but then, I still haven’t been to the Statue of Liberty.

But the thing about Fraunces Tavern is that it’s a lot like George Washington’s axe. Much of the original structure has been replaced over the years, but there’s still enough left to make it delicious. And then there’s its heating system.

Okay, imagine this antique building that has since been connected to other antique buildings next door, and at some point (probably in the 1930s) some heating company had to install central heat. They chose steam, which isn’t a surprise, but how they got the big boiler, piping, and radiation into this dog’s breakfast of construction had me gagging.

The basement of this place was more suitable to James Madison, who stood 5 foot four. then it would have been for George Washington, who towered at just a bit less than six foot two, which is also where you’ll find me. But then none of us ever had to install those boilers and pipes. Watch your head.

At some point, a heating contractor got in there and ran piping everywhere. He chose to use cast-iron convectors, connecting some of them with one-pipe steam, and others using two pipes, but without steam traps. This is what we call the two-pipe, air-vent system. It acts like one-pipe steam, but the radiators have drains for the condensate.

The building needed ventilation, so the long-gone contractor hid a steam coil inside ductwork down in the basement. The coil was several inches off the floor, tucked back there in a spot Houdini couldn’t reach. An abandoned control valve sat on the steam line that served the coil, and an abandoned, self-priming pump (operated by a float switch), once sucked condensate from the buried tub and transferred it to a return line, wishing it good luck on its way back to the boiler. This, too, was now just history.

The building superintendent was from Russia, spoke little English, and had, while in Russia, worked on locomotives. All of which made him perfect for the job of keeping Fraunces Tavern up and running. To get the coil to work, he would open a drain line (which let out the air), and once the steam entered the coil, he would flip the switch for the fan, and drain all the condensate into the sewer line. He had no idea why he was doing any of this, other than the system worked when he did it, and that was good enough for him. The boiler took on plenty of fresh water as a result, but that wasn’t a problem because the boiler was soon to leave the building.

Which brings me to this part of the story: The building houses not only a museum, but also a bar and a restaurant and meeting space as well. Over the years, as tenants came and went, contractors replaced parts of the heating system, taking lots of steam radiators off line, but never considering what this does to the boiler. An oversized steam boiler really knows how to waste fuel.

At one point, Fraunces Tavern was host to the visiting Magna Carta, which doesn’t get on well with steam heat, so they had a high-tech HVAC system installed in that part of the museum. The rest of the museum, with all its glorious paintings and American artifacts, still has the steam and those rooms were as hot as a firepit in Hell.

Which is why I was there poking around with the heating contractor. The solution for most of the radiators was to use thermostatic radiator valves between the radiator air vents and the radiators. These will shut off the air vents when the rooms reach the temperature set on the individual TRVs. If air can’t get out, steam can’t get in. That will solve the biggest complaint, which was overheating. When a room gets too hot someone opens a window. The TRVs will work the same way on the one-pipe-steam radiators and the two-pipe, air-vent radiators.

For that steam coil, I prescribed a new control valve, operated by an electric thermostat. The thermostat would have an end switch to start and stop the fan. We also needed a float & thermostatic trap after the coil, which would drain the condensate into a transfer pump. By sending the condensate back to the boiler rather than to the sewer the new boiler will last a lot longer than the old boiler did.

And the new boiler will be the right size for what’s there now. The contractor measured all the radiation (including the coil) and sized the boiler to that load, with a 1.5 pick-up factor for the piping. He then selected the boiler based on the manufacturer’s stated D.O.E. Heating Capacity rather than its Net rating. That allows for the extra steam piping that’s still all over the place in this early-American mechanical jungle.

Another part of the building has a ductless mini-split hanging on the wall, and still other parts have electric baseboard. All this, along with the steam. And the fireplaces. So many years, so many hands.

My favorite part of the day, though (beside lunch and all that poking around), was realizing that the contractor knew what he had to do even before I even got there. This guy was sharp. He just wanted someone else to look with him, think it through, and hopefully, say that he was right. He also wanted to share the wonder of this place. And in that way, he was like a schoolboy. As was I.

I hope you enjoyed that story. I wish you could have been there with me. And if you did enjoy the story, please share it with your friends. And please subscribe to this podcast if you haven’t already. I have many more Dead Men Tales to share with you. Thanks for listening. It means a lot.

Leave a comment

Related Posts

The Legacy of the Dead Men

In this episode, Dan Holohan reflects on the Dead Men who came before us and the legacy they left behind. Episode Transcript My earliest memory of school goes like this: ...

Published on 12/27/2022 4:45 AM
Pivotal Advice

In this episode, Dan Holohan shares the advice that changed his life. Episode Transcript Advice sometimes comes unsolicited (like now) and other times it comes after you’...

Published on 12/20/2022 4:45 AM
Pipe Stories

In this episode, Dan Holohan shares the tale of how nominal pipe sizes came to be, as well as some comical work stories. Episode Transcript I called the plumber because t...

Published on 12/13/2022 4:45 AM